This is my current non-primary-work to-do list – for Harena to review, prioritize (within category), and update as needed.
Practical
Time-Sensitive
Low-Hanging Fruit
- post circuit pix for scanlime
- finish coloring in circuit traces
- take photos of that
- clean mouse refuse from container cabinet
- look to see if there are openings which could be sealed (probly dishwasher lines)
- Hook for mesh laundry bag
- recompile FerretCalc as it currently is & install on Bunsen
Medium Brain Tasks
- try to get Eudora working on anything at all
- add features to TapeCalc
- what was the problem with it before? works for me.
Medium Physical Tasks
- finish going through box of dirty containers
Avoidant Day Trips
- replace drain in upstairs sink
Major Projects
- raise washer & dryer up on platform
- build proper desk for H ($)
|
“What a to-doooo!" -- Glimfeather, The Silver Chair
Misc.
|
Creative
Music
- finish "Stage of Life"
- start on "Motel Universe"
Video
- our "work" histories & UBI
Blocked Tasks
- mount panel lighting in fridge area
- blocker: need bypass circuit
|
Add/Change Requests
Handled
- (from H) Re FerretCalc: It would just randomly crash, i think? And type multiple digits when only pressing a key once. I will have to see if i can find it and do testing again.
- (from W) H says she cannot find it; reinstallation added to do-list