User:Woozle/to-do

From HypertWiki
< User:Woozle
Revision as of 22:10, 29 April 2005 by Woozle (talk | contribs)
Jump to navigation Jump to search

Woozle: To-Do List

Introduction

I keep my to-do list here in the wiki, for all to see, for the following reasons:

  • <insert sad violin> so people can see how terribly I suffer under the yoke of overwork etc.
  • So Harena can keep tabs on it, add stuff, etc.
  • So others can offer suggestions, etc.
  • Perhaps the public display of the list will encourage me not to abandon it, etc.
  • etc.

Harena Reminders

  1. (4/28) Check for bills to pay!

The List

  1. (vbz, 4/28) Enter Liquid Blue 2004 Winter catalog, as it seems to have been... not entered. o.O
  2. (me, 4/27) find some sample images for Kitten to process. Upload them, with instructions.
  3. (me, 4/19) Finish moving stuff off old 20GB HDs so they're available for "new" Win98 system
  4. (VBZ, 4/14) Fix problem with Stock Log table -- restock items are having their Restock Item ID logged instead of the Restock ID.
  5. (VBZ, 3/?) Fix problem with catalog topics (not showing anything) -- turns out to be same as this problem:
    • (VBZ, 3/20) Revise topic pages script to group items by type (had this working earlier; where did that go??)
  6. (VBZ, 3/?) Process scanned and photographed merchandise images
  7. (VBZ, 4/11) create new images for new ZR items
  8. (me/VBZ, 2003) Finish mail-importing-and-management thing (needed for RDA Dispute and for organizing VBZ customer emails)
  9. (Harena, 4/1) Lower H's monitor arm thingy
  10. (VBZ, 4/2) Modify shipping database so items "removed" from stock are still logged, destination Null (with comment)
  11. (Harena, 3/31) shelf for above Zander's desk
  12. (VBZ, 3/20) Move all discontinued MT cat#s to "Discontinued" section. Add redirects for all old MT catalog #s. Delete old pages.
  13. (Harena, 3/28) Need place to put documents/letters to be taken out of the office, preferably with flat spot on top for other stuff
  14. (Harena, 3/26) Write generic credit-card-account-closing letter
  15. (VBZ, 3/20) Finish entering Mountain catalog (children's, longsleeve, etc.)
  16. (VBZ, 3/20) Assign topics to new items
  17. (Harena, 3/22) email Mitsumi webmaster about missing driver for Rev M card-reader/floppy drive
  18. (VBZ, 3/?) Set up HappyLife items in database
  19. (VBZ, 3/?) Grab HappyLife images from web and process them
  20. (VBZ, 3/28) Research different companies listed in http://authorize.net/solutions/merchantsolutions/resellerdirectory/ and apply for processing (one of them? more?)
  21. (VBZ, ~3/1) migrate VBZ from shared hosting to dedicated server (hopefully before next billing cycle)
  22. (me, 3/?) Send Anna an email with Thoughts in it.
  23. (VBZ/me) Begin posting info on lawsuit, and discuss pros/cons of publishing more than just the public documents
  24. (VBZ) Desperately need mailing list sub/unsub web script so VBZ can have a mailing list with multiple categories
  25. (VBZ) put tags on loose inventory and put it in proper boxes
  26. (Harena, ~3/20) email Jackson's mom about possible playdate(s) for Benjamin
  27. (me) either get sound recording working on Linux, or move multitrack audio card over/back to Win98
  28. (me/VBZ) Set up regular backups for Camilla & Bunsen

(this list is by no means complete)

In-Between Tasks

tasks not requiring much thought, so they can be done while waiting for computers etc.

  1. (Hypertwins 3/22) add more blockage to half-door so Benj can't unlock it

On Hold

items scheduled or awaiting resources that are currently unavailable

  1. (VBZ, 4/8; hold until 4/13) submit MT restock order (2nd Day Air)
  2. (Harena) Consolidate Verizon landlines on ringtones & caller ID (Verizon needs permission letter first so I can make changes)
  3. (VBZ 3/22 from neglected email of 3/18) Formally send in dispute of $60 chargeback (grr... sent it via email... but they want it faxed or something) -- need signed statement from Tene as proof
  4. (VBZ, 3/25) Email F1741, F1746, F2092, F2163, F2312, F2344, F2355, F2419, F2477, F2500: do they still want the stuff they ordered? -- need to import F1xxx order emails, which needs email importer thingy because I'm tired of importing folders piecemeal

Low Priority

  1. (me) Add GA Dispute information to wiki
  2. (me) Revise Issuepedia to be more intuitive
  3. (me, 3/28) Create neighborhood wiki
  4. (me) Create tech wiki
  5. (VBZ) investigate state of mySQL on dedicated server

Long-Term

  1. (general, 2004) bury internet cable down to pole
  2. (Harena, 2004) Finish backyard fence (before weather gets nice would be good)
  3. (Harena, 2003) Stairs down to lower backyard
  4. (Harena, 2001) Laundry room remodeling
    1. Build new sink base cabinet for laundry rm. (may need riser to accomodate plumbing)
    2. Have replacement sink base cabinet & sink ready for kitchen
    3. Remove cast-iron sink from kitchen & install it in new cabinet
    4. Install replacement sink base cabinet in kitchen
    5. Rip out old, rotten sink base cabinet from laundry room (may have to be done earlier, to make room)
    6. Rearrange washer/dryer against wall
  5. (Harena, 3/2005) Build wrap around benches & table for Breakfast Nook
    1. Move lower shelf on bathroom-side wall so it isn't at head-level
    2. Build benches (do we need a new table?)(yes, it would have to be a special narrow one; maybe one of the closet doors we got from Kathy)
  6. (VBZ, 2003) rewrite shopping cart software to use mySQL
  7. Projects

Done

  1. (vbz, 4/26; done 4/29) Process orders for SunDog shirts that came in, and any others for in-stock items.
  2. (me/VBZ, 4/24; done 4/28) Take notes on documents from Them in preparation for Thursday's phone call (Phone call moved to Tuesday as a result of notes, yay)
  3. (me, 4/25; done 4/26) Get Mokey set up with software to investigate FormTool issue for G. Mayhall
  4. (me, 4/19; done 4/25) Get Win98 workstation (Mokey, old Kittenmaschien) going
  5. (me, 4/22) fix old Kittenmaschien system board so it will boot without requiring alligator clips, and install in chassis.
  6. (me, off-list; done 4/20) Set up issuepedia.org wiki (all but a few details done, e.g. logo image and of course recreating content)
  7. (me, off-list; done 4/15) Set up Hypertwin Wiki to accomodate most urgent stuff from SquadWiki (mainly this to-do list)
  8. (VBZ, 4/13; cancelled 4/13) call ZR to confirm they got the order sent 4/11 -- never mind; got confirming email 4/13
  9. (Harena, 4/12; done 4/13) Update Perlman statement
  10. (Harena, off-list; done 4/13) Emailed Arc of NC back about calling
  11. (VBZ, 4/4; done 4/11) Place ZR order, if nothing more urgent has come along
  12. (Hypertwins, off-list; done 4/11) Mowed lawn
  13. (VBZ, 4/10; done 4/11) Rebuild ZR pages (now need to do new images)
  14. (Hypertwins, 3/26 (revised); done 4/9) Put up whiteboard for use as Harena's to-do list
  15. (VBZ, 4/8; done 4/9) Send bill to LD's dad
  16. (VBZ, 4/7; done 4/9) ship in-stock order(s)
  17. (VBZ, 3/?; done 4/10) Enter new Zion Rootswear catalog
  18. (VBZ, 4/8; done 4/8) Checked for additional orders; put MT restock on hold until next Wednesday
  19. (Harena, escalated 4/7; done 4/7) Compose letter to send Verizon giving permission for me to make changes on her accounts
  20. (Harena, off-list; done 4/7) processed more Josh forms
  21. (me, 4/6; done 4/6) make techwiki index (was techwiki on SquakWiki)
  22. (me, 4/6; done 4/6) move & re-link issuepedia (now encyclopinion) pages
  23. (me, 4/2; done 4/3) Wrote analysis of first 3 sections of OSC article; had to postpone the rest because it was taking too long. (Note: this got deleted in the Great SquadWiki Deletion of 2005)
  24. (VBZ, subtask; done 4/2) unpack old problem orders which have been sitting around since the millennium
  25. (VBZ, 3/30; done 4/2) Create an "I spoke with the customer" document for Tene to examine and maybe sign
  26. (VBZ, 4/1; done 4/2) Ship SD order which arrived 4/1
  27. (VBZ, 3/29; done 3/30) ship LB order which arrived 3/29
  28. (Harena, 3/30; done 3/30) Sent email to Central Park School. Received phone call, making it unnecessary for me to call them.
  29. (Harena/general, off-list; done 3/30) bury internet cable where it crosses walkway
  30. (VBZ, 3/30; done 3/30) Place another order (probably SD)
  31. (Harena, off-list; done 3/29) chopped up fallen tree in back yard
  32. (Harena, 3/24; done 3/28) Fix scans of Arc forms so H can fill them out
  33. (Harena, off-list; done 3/28) fix scans of Josh Summer Camp forms for processing
  34. (Harena, off-list; done 3/28) scan Josh forms for summer camp
  35. (me, off-list; done 3/28) Revised Issuepedia GWB pages to be more intuitive; added Peace Amendment issue
  36. (me, 3/27; done 3/28) send JERS invoice/receipt for repairs
  37. (me/VBZ, 3/27; done 3/27) repair stupid laptop
  38. (relatives, off-list emergency; 3/26-3/27) repair JERS's computer network & internet
  39. (relatives, 3/22; done 3/26) Send Harena's crocheted blanket to Jess, with picture.
  40. (family/Harena 2/?; done 3/25) Fix image of baby-blanket so H can print it and we can send blanket to Jess
  41. (Harena, 3/24; done 3/25) Email Melissa Bent @ The Arc
  42. (VBZ, 3/24; done 3/25) Ship Mountain shirts
  43. (Harena, 3/25; done 3/25) fix Bunsen's network problem (was dead onboard network hardware; added PCI net card)
  44. (VBZ, 3/25; done 3/25) place LB order (before noon)
  45. (VBZ, 3/24) process credit cards for MT order just arrived
  46. (Harena, off-list; done 3/24) letter revision, icky phone call, Josh IEP meeting
  47. (VBZ, 3/22; done 3/24) Belatedly process order with corrected credit card (forgot)
  48. (Harena, 3/23; done 3/24) lots of scanning (and a letter to Hope Valley)
  49. (VBZ - 3/20; done 3/22) ship that in-stock order that came in (another one also came in, but ccard was mis-typed... emailed customer)
  50. (Harena - 3/22; done 3/22) email Central Park School to ask same questions as phone call, and be prepared to call again on 3/23 if no answer.
  51. (Harena - 3/22; done 3/22) Call Central Park School to ask if possibly Benjamin can start early, since he's been accepted there and we've withdrawn him from Hope Valley (and also find out what's happening with the registration paperwork)
  52. (Harena - 3/22; done 3/22) Email Peter Perlman to cancel for Wednesday