Difference between revisions of "User:Woozle/Pinecrest Tasks"
Jump to navigation
Jump to search
m (and another - soap making, and Zander drawers) |
m |
||
(9 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
(Preliminary list, to be ordered by priority and categorized by task size) | (Preliminary list, to be ordered by priority and categorized by task size) | ||
==To Do== | |||
# (Harena) | ===Immediate=== | ||
* [[Childsitting|Babysitter Army]] | |||
* Water heater replacement (in progress) | |||
===Kids=== | |||
# Check what CFS needs: (1) copy of signed tax returns (2) copies of W-2 and 1099 forms | |||
# Compile list of summer deadlines | |||
# "get Harena's butt in gear" to go to Social Security Office (corner of Towerview and Pickett) to get disability for Josh | |||
===3rd Party=== | |||
# Find tree person to take out pine-beetle-infested tree in back yard | |||
# Compile list of carpentry & plumbing tasks to be prioritized | |||
#* Repair ceiling in bedroom | |||
#* Attic stairs? (get estimate) | |||
===Building/Remodeling Projects=== | |||
# video/stock shelves in front hallway | |||
# shelf in upstairs bathroom | |||
# Build wood ladder for Bunk Bed | |||
# (Harena, 3/31) shelf for above Zander's desk | # (Harena, 3/31) shelf for above Zander's desk | ||
# (Harena, 3/28) Need place to put documents/letters to be taken out of the office, preferably with flat spot on top for other stuff | # (Harena, 3/28) Need place to put documents/letters to be taken out of the office, preferably with flat spot on top for other stuff | ||
Line 24: | Line 39: | ||
# Ventilation for basement so soap-making can happen | # Ventilation for basement so soap-making can happen | ||
# Put proper runners on Zander's built-in clothing drawers | # Put proper runners on Zander's built-in clothing drawers | ||
==Done== | |||
* (done 2006-01-19) Home insurance | |||
# (Harena) Consolidate Verizon landlines on ringtones & caller ID (or put line 1 on Vonage, maybe? Or skype? Explore options.) | |||
# (2005-10-04) Reinflate Josh's excercise ball before weather outside becomes unpleasantly cold (not sure whether this was the blue one upstairs or the grey one in the basement; the blue one got done, and the grey one got ditched) |
Latest revision as of 21:57, 25 April 2006
(Preliminary list, to be ordered by priority and categorized by task size)
To Do
Immediate
- Babysitter Army
- Water heater replacement (in progress)
Kids
- Check what CFS needs: (1) copy of signed tax returns (2) copies of W-2 and 1099 forms
- Compile list of summer deadlines
- "get Harena's butt in gear" to go to Social Security Office (corner of Towerview and Pickett) to get disability for Josh
3rd Party
- Find tree person to take out pine-beetle-infested tree in back yard
- Compile list of carpentry & plumbing tasks to be prioritized
- Repair ceiling in bedroom
- Attic stairs? (get estimate)
Building/Remodeling Projects
- video/stock shelves in front hallway
- shelf in upstairs bathroom
- Build wood ladder for Bunk Bed
- (Harena, 3/31) shelf for above Zander's desk
- (Harena, 3/28) Need place to put documents/letters to be taken out of the office, preferably with flat spot on top for other stuff
- (general, 2004) bury internet cable down to pole
- (Harena, 2004) Finish backyard fence (before weather gets nice would be good)
- (Harena, 2003) Stairs down to lower backyard
- (Harena, 2001) Laundry room remodeling
- Build new sink base cabinet for laundry rm. (may need riser to accomodate plumbing)
- Have replacement sink base cabinet & sink ready for kitchen
- Remove cast-iron sink from kitchen & install it in new cabinet
- Install replacement sink base cabinet in kitchen
- Rip out old, rotten sink base cabinet from laundry room (may have to be done earlier, to make room)
- Rearrange washer/dryer against wall
- (Harena, 3/2005) Build wrap around benches & table for Breakfast Nook
- Move lower shelf on bathroom-side wall so it isn't at head-level
- Build benches (do we need a new table?)(yes, it would have to be a special narrow one; maybe one of the closet doors we got from Kathy)
- Storage shelves in downstairs bathroom
- Second tpaper dispenser in downstairs bathroom
- Fold-down stairs for attic (to be followed by general attic improvements so it can be used for storage)
- Repair ceiling in Mel's room (requires better access to attic)
- Replace shower/bath controls with new thermo-controlled thingy
- Ventilation for basement so soap-making can happen
- Put proper runners on Zander's built-in clothing drawers
Done
- (done 2006-01-19) Home insurance
- (Harena) Consolidate Verizon landlines on ringtones & caller ID (or put line 1 on Vonage, maybe? Or skype? Explore options.)
- (2005-10-04) Reinflate Josh's excercise ball before weather outside becomes unpleasantly cold (not sure whether this was the blue one upstairs or the grey one in the basement; the blue one got done, and the grey one got ditched)