Difference between revisions of "Pierce Manufacturing"
Jump to navigation
Jump to search
(correction) |
m (more precise dates) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
[[category:companies]] | [[category:companies]] | ||
[[category:jobs]] | [[category:jobs]] | ||
[[Woozle|I]] worked at Pierce as a contractor (through Aerotek) from | [[category:woozle]] | ||
[[category:Wisconsin]] | |||
[[File:Woozle in office at Pierce slide.web.jpg|thumb|300px]] | |||
[[Woozle|I]] worked at Pierce as a contractor (through Aerotek) from late September 1997 to mid-November 1998<ref name=timeline />. I was at the [http://maps.google.com/maps?geocode=&q=3169+North+McCarthy+Road,+Appleton,+WI&ll=44.291664,-88.486848&spn=0.009446,0.026157&z=16 McCarthy Road] plant initially, and later at the headquarters a few miles south. (As of 2012, you can see the Pierce logo in the Street View at that link.) | |||
The project I worked on was the first attempt (that I know of) to use digital multiplexing to control onboard devices (e.g. external lights, aerials, pumps) on a fire engine. I'm guessing that this later evolved into the "Command Zone" system, but at the time there was no screen involved, just switches and lights. | The project I worked on was the first attempt (that I know of) to use digital multiplexing to control onboard devices (e.g. external lights, aerials, pumps) on a fire engine. I'm guessing that this later evolved into the "Command Zone" system, but at the time there was no screen involved, just switches and lights. | ||
Line 7: | Line 10: | ||
I drove there from [[Athens]] (and back) in [[The Nissan]], roughly a 16-hour trip each way, at least four times (two round trips). | I drove there from [[Athens]] (and back) in [[The Nissan]], roughly a 16-hour trip each way, at least four times (two round trips). | ||
For more about Pierce, see {{htyp}}. | * For more about my time in Appleton, see [[Appleton]]. | ||
* For more about Pierce, see {{htyp}}. | |||
==Footnote== | |||
<references> | |||
<ref name=timeline>source: [[Griever/Detailed Timeline]]</ref> | |||
</references> |
Latest revision as of 17:00, 21 December 2019
I worked at Pierce as a contractor (through Aerotek) from late September 1997 to mid-November 1998[1]. I was at the McCarthy Road plant initially, and later at the headquarters a few miles south. (As of 2012, you can see the Pierce logo in the Street View at that link.)
The project I worked on was the first attempt (that I know of) to use digital multiplexing to control onboard devices (e.g. external lights, aerials, pumps) on a fire engine. I'm guessing that this later evolved into the "Command Zone" system, but at the time there was no screen involved, just switches and lights.
I drove there from Athens (and back) in The Nissan, roughly a 16-hour trip each way, at least four times (two round trips).
Footnote
- ↑ source: Griever/Detailed Timeline