<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://hypertwins.org/mw/index.php?action=history&amp;feed=atom&amp;title=1994-11-29_Woozle_writes_to_Tim</id>
	<title>1994-11-29 Woozle writes to Tim - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://hypertwins.org/mw/index.php?action=history&amp;feed=atom&amp;title=1994-11-29_Woozle_writes_to_Tim"/>
	<link rel="alternate" type="text/html" href="https://hypertwins.org/mw/index.php?title=1994-11-29_Woozle_writes_to_Tim&amp;action=history"/>
	<updated>2026-04-17T03:57:41Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.43.0</generator>
	<entry>
		<id>https://hypertwins.org/mw/index.php?title=1994-11-29_Woozle_writes_to_Tim&amp;diff=5980&amp;oldid=prev</id>
		<title>Woozle at 22:09, 6 January 2006</title>
		<link rel="alternate" type="text/html" href="https://hypertwins.org/mw/index.php?title=1994-11-29_Woozle_writes_to_Tim&amp;diff=5980&amp;oldid=prev"/>
		<updated>2006-01-06T22:09:27Z</updated>

		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;[[Category:Dated Items]][[Category:1994]][[Category:Woozle letters]]Heya Tim,&lt;br /&gt;
Thanks for the check.  I would have gotten back to you sooner, but (as you might have guessed) we’ve been a bit busy...&lt;br /&gt;
&lt;br /&gt;
The situation at the studio has changed a bit, I think for the better.  Dan has taken all his equipment (except for his half of the mixing board) and turned over the lease; he will no longer be “formally” involved with the studio, though he may be doing some work there.&lt;br /&gt;
&lt;br /&gt;
The owners will be (once the paperwork is all set up): myself, Dave Fredricks (the Lulu’s guy), Shawn, and probably Brian Morris.  We spent the weekend before last making repairs: I rebuilt the front stairs, and Brian knocked down the chimney (and patched the roof), preparatory to re-seating the center beam and replacing the floor joists.  After that we’ve got the bathroom to finish, drywall to put up, and a false sound-wall to create.  The wiring needs work and there are also a bunch of “minor” (ha ha) things to attend to.  We’re hoping to have the place ready by January so we can spend that month learning the equipment; if that works out, we’ll start actively seeking clientele in February.&lt;br /&gt;
&lt;br /&gt;
I look forward to hearing your tape.  Dan gave me the rough draft of his (would you like a copy?  It would be 2nd generation, tho) and while I think it’s interesting, I find myself a bit underwhelmed.  We’ll see how the public responds...&lt;br /&gt;
&lt;br /&gt;
That’s all for now.  Keep in touch...&lt;br /&gt;
&lt;br /&gt;
Nick (Livia &amp;amp; Anna in attendance)&lt;/div&gt;</summary>
		<author><name>Woozle</name></author>
	</entry>
</feed>